Dayton used finite engineering practices to ensure to high pressure gas mains and storage tanks were not damaged.

DUKE ENERGY
Dayton monitored multiple implosion demolitions of industrial structures throughout NC and GA.
Dayton used finite engineering practices to ensure to high pressure gas mains and storage tanks were not damaged.

Dayton monitored multiple implosion demolitions of industrial structures throughout NC and GA.

Dayton monitored the implosion demolition of multiple industrial structures within this plant.