REVEL CASINO
Dayton controlled piling installation activities, where piles were installed to an average depth of 200 feet.
Dayton controlled piling installation activities, where piles were installed to an average depth of 200 feet.
Dayton provided remote vibration monitoring for the construction of the seawall after Superstorm Sandy.
Dayton used finite engineering practices to ensure to high pressure gas mains and storage tanks were not damaged.
Dayton monitored and analyzed the vibration impact to the proton therapy unit during a 100 foot deep blasting project.
Dayton assisted in the reconstruction of the main seawalls along the Schuylkill River adjacent to this landmark building.
Dayton designed and implemented a plan to monitor and control vibration and sound propagation in this critically sensitive environment.
Dayton monitored vibration and sound impact on research specimens during a multi-floor reconstruction project.